Plan production around real demand, capacity, and routing.
Why teams choose 247 Labs
We have delivered custom systems for manufacturing, operations, and data-heavy business environments for more than a decade.
Clients choose 247 Labs for practical workflow design, strong engineering, and delivery built around operating constraints.
Our team has shipped platforms, dashboards, integrations, and custom software for organizations with complex execution models.
Our Clients
The platforms and partners we build with.
We integrate across the tools and technologies trusted by enterprise teams, grouped by where they fit in the stack.
Healthcare
Government
Technology
Finance
Services
ERP planning services for accurate MRP, demand, capacity, and scheduling.
We scope planning work around one operating model, one set of constraints, and one clear accuracy target so the plan supports the floor instead of fighting it.
Planning assessment
Review current MRP, forecasting, and scheduling workflows, find where the plan drifts, and define the right build or extension path.
MRP and material planning
Build MRP runs that use live inventory, BOMs, and lead times so material requirements stay accurate as orders change.
Demand planning
Create forecasting and demand-input workflows that feed the plan with structured, reviewable data instead of side spreadsheets.
Capacity planning
Model work center load, available hours, and constraints so planners can see where capacity will break before it does.
Production scheduling
Build scheduling tools that respect routing, sequence rules, and constraints so the floor runs a plan that holds.
Planning integrations
Sync planning with MES, inventory, sales, and forecasting systems so every input lands in one dependable plan.
Challenge Map
Fix the gaps that make planning unreliable.
Planning breaks when MRP runs on stale data, demand and capacity are guessed in spreadsheets, or schedules ignore real routing and constraints. We close those gaps so the plan teams act on actually holds.
MRP runs on stale data, so material and order plans are wrong before they ship.
We connect MRP to live inventory, BOMs, lead times, and order changes so material requirements update against reality instead of a monthly snapshot.
Strong fit for multi-step production.Demand and capacity planning happen in spreadsheets the ERP never sees.
We build demand and capacity planning workflows inside the ERP so forecasts, load, and available hours sit on the same record planners and the floor already use.
Useful for high-mix teams.Schedules ignore real routing and constraints, so the floor reworks the plan daily.
We build scheduling tools that respect routing, work center capacity, and sequence rules so the plan the floor receives is one they can actually run.
Best where reschedule churn is high.Case Studies
Proof for workflow redesign and visibility.
TeraPeak: ETL and dashboard delivery for daily operating insight
30,000+ hours returned to the business
247 Labs built a custom ETL framework and dashboard that turned large volumes of raw market data into a dependable operating view, demonstrating strong reporting and data-structure execution.
Read case study →
OnStar: booking workflow integrated into an enterprise stack
Improved satisfaction, retention, and revenue
247 Labs developed an advisor booking web app and integrated it into GM's environment, proving that new operational workflows can be introduced cleanly inside larger systems.
Read case study →
Foscam: rebuilt customer platform with stronger architecture and flow
2x online sales within 6 months
247 Labs re-architected Foscam's ecommerce experience with Magento and custom landing pages, demonstrating disciplined platform delivery across design, build, and operational performance.
Read case study →Capabilities
The strategy, build, and control layers needed for planning teams can trust.
We help teams define the planning model correctly, build accurate MRP and scheduling workflows, and keep planning data reliable over time.
Map the real planning model
We define demand inputs, constraints, planning horizons, and accuracy targets before changing how the plan is built.
- Planning workflow and gap mapping
- Demand and capacity input review
- Lead time and BOM data planning
- Plan accuracy and KPI targets
Build planning around production reality
We create MRP, scheduling, and capacity workflows that respect routing, materials, and real constraints.
- MRP and material planning runs
- Demand and forecast workflows
- Capacity and load modeling
- Constraint-aware scheduling tools
Make plan risk visible sooner
We design dashboards and reporting that surface shortages, overload, and schedule slip before they reach the floor.
- Material shortage alerts
- Capacity and load dashboards
- Schedule slip and risk views
- Plan-vs-actual reporting
Protect plan data and control
We define access, audit, data rules, and change control so planning inputs stay dependable over time.
- Audit and edit history
- Role-based planning permissions
- Master data quality controls
- Plan change management rules
Tech Stack
Planning should connect to the demand, inventory, and shop floor systems that feed every plan.
We connect ERP planning to plant, quality, and warehouse systems so it becomes a reliable control layer.
247 Labs and there team were highly effective in their work, it is rare to find speed, detail and perfection, they have all three. Our team had an explosive idea, 247 Labs helped us get it off the ground.
Sarmad Ibrahim, AI Innovation Manager, IBM
Business Benefits
Better planning means fewer shortages, less expediting, and a plan that holds.
The payoff comes from accurate MRP, realistic schedules, and one set of planning inputs teams can rely on.
Higher plan accuracy
Run MRP and schedules against live inventory, routing, and order logic instead of stale snapshots.
Fewer material shortages
Catch shortages and long-lead items early so production is not stalled waiting on parts.
Realistic capacity loading
Plan against actual work center hours and constraints so commitments match what the floor can deliver.
Less spreadsheet planning
Reduce side spreadsheets created to compensate for planning gaps the ERP never closed.
Earlier risk visibility
Give planners a clearer view of shortages, overload, and schedule slip before they hit the floor.
Ready to build ERP planning that matches how your plant actually runs?
Talk with 247 Labs about your MRP, demand, capacity, and scheduling gaps so planning can support better commitments and less expediting.
Start Your ERP ProjectFAQ
Common questions before an ERP planning project starts.
Yes. In many cases we extend MRP, demand, capacity, or scheduling workflows around your existing ERP so planning improves while the core system stays in place.
We trace the bad data back to its source, usually inventory accuracy, BOMs, or lead times, then connect MRP to live inputs so the runs reflect reality and planners can act on them.
Yes. We model real work center load, available hours, and constraints, and we build demand inputs into the ERP so forecasts and capacity live on the same record as production.
Yes. We commonly connect planning to execution, inventory, forecasting, and sales tools through APIs, events, and structured data sync so every input lands in one dependable plan.
Let’s build something
great together.
We’re happy to answer any questions you may have and help you determine which of our services best fits your needs.
Call us at 1-877-247-7421 or email hello@247labs.com
Your Benefits:
- Client Oriented
- Independent
- Competent
- Result-driven
- Problem-solving
- Transparent
What happens next?​
1
We schedule a call at your convenience
2
We do a discovery and consulting meetingÂ
3
We prepare a proposalÂ